ACONE Installation Log

Day 5 (Oct. 29): Final configuration for ACONE system.

Check hardware status

 

Working from boat. We have identified magnetic interference problem inside the control box. 

 

We have to use aluminum foil to shield control box and bypass thermostat to fix the probem.

 

Dr. Liu helped tying the boat around the electric pole.

 

Dr. Liu tied the lock to the box.

 

Time to say goodbye. The system is quietly running in the middle of the forest.

ACONE Installation | ACONE | CONE